nyc dot traffic standard drawings

When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. (212) 839-9561/9566 All public and private actions must comply with all applicable laws, rules, and regulations, not solely those listed below. (212) 839-8980 NYC Parks & Recreation Its overall goals are both far-reaching and vital: sustaining the city's investment in its streets, enhancing access to subsurface infrastructure and minimizing transportation and community disruptions. The permittee must attach a copy of the original permit to the application when it is submitted for renewal and all applicable reviews and fees will apply. If the proposed location may be suitable, HIQA performs an inspection in order to confirm its suitability. Third, following installation of the canopy, a final inspection by HIQA is required to confirm compliance with the applicant's submitted plans. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. Additionally, High Density Polyethylene (HDPE) conduit, a more cost-effective material that is not susceptible to corrosion from residual salt water after storm surge events, is replacing galvanized steel for all signal locations and street light locations in flood-vulnerable areas. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The following procedures must be followed to obtain either an emergency authorization number (EAN) for emergency utility access cover work or an Emergency Street Opening Permit Number for emergency street opening work. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. Canopy permits are generally taken out by building owners, business owners, and canopy installers. More information on this and other "holds" that may be placed on permit applications can be found in, Protected street status for intersections, Active/Future start dates of projects for segments, Active/Future start dates of projects for intersections. Once Finance contacts HIQA, the hold(s) will be released. A list of partially and fully restricted streets where canopy placement is limited or prohibited can be found in the Highway Rules, Section 2-04(f). New York City streets include a complex mix of assets such as electric, gas, telephone, cable, water, sewer and steam lines, requiring coordination among the different asset owners when street work is performed. POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. MAY WORK 7AM TO 8PM IN PARKING LANE ONLY TO OPEN UNDERGROUND STREET ACCESS COVERS FOR REPAIRS AND OR CABLE PULLS. 120-55 Queens Boulevard, 1st floor, Room 1-240 MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. Additional requirements are contained in Sections 2-02 and 2-09 of the Highway Rulesand should be consulted before any work is performed on the street. SPECIFICATION. 2016 CT.gov | Connecticut's Official State Website, regular Based on the documents submitted, HIQA makes a preliminary determination as to whether the proposed location may be suitable for a canopy. Building Operations/Construction Activity Permits apply to construction activities that take place within the street and are generally associated with construction work adjacent to the street. There is a central Permit Office in Manhattan and borough Permit Offices in each of the other boroughs. WORK ALLOWED 8 PM TO 6 AM NIGHTLY. MUST BE AN UNRESTRICTED PARKING LANE. Attn: Forestry Download about 619-011: Work Zone Traffic Control General Tables & Legend; General Information 619-012: Sign Table Keywords: Sign, Table. The Office of Construction Mitigation and Coordination (OCMC) reviews all construction permit applications and develops construction activity, Completed Permittee Registration Application. PEU also accepts applications to abandon existing vaults that are no longer in use. (646) 892-1388/1389 Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. Sidewalk Construction Permits are generally taken out by entities that need to perform work on sidewalks, including developers, contractors, and private homeowners (for sidewalk repairs and only if performing the work themselves). Outlined below are the basic application procedures for Building Operations/Construction Activity Permits. To request release of a DOF hold, the permittee must contact Finance and either make a payment or agree to a payment schedule for all fees associated with the outstanding summonses/NOVs. Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. For questions, Mon-Fri 8:30 AM until 5:00 PM. This category of permits applies to any repairs, replacements or new sidewalk installations. An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. PHONE # 718-422-8700 FAX # 718-422-8710. 1 Bronx River Parkway WORK 11 PM TO 5 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. Office hours: 8:30 AM-4:30 PM, Queens IN SUCH COMMERCIAL DISTRICTS IF MORE THAN 50% OF SIDEWALK FRONTAGE IS REPAIRED/REPLACED THE ENTIRE SIDEWALK MUST BE REPLACED IN CONFORMANCE WITH THE 4.13 C DEPT. Fax: 718-596-2609, Central Office Transformer vaults are typically installed, owned and maintained by an electric utility company. Tel: (718) 298-7300 4.0 Executing Work in the Street - Streetworksmanual.nyc Unauthorized removal of muni-meters is prohibited. (212) 748-6670 RED LIGHT CAMERA CONDUIT IS LOCATED IN YOUR PROPOSED WORK AREA. Contact information can be found in Appendix C, NYC DOT Contact Information. To request release of a COB hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed to arrange for an inspector to visit the work site prior to the start of the work. DESIGNATED LANDMARK AREA. Click here for a completed. Unsafe Conditions If the permittee has been notified and fails to address an unsafe condition, all future permit requests may be placed on hold until the unsafe condition has been eliminated. Work Site Safety All obstructions on the street must be protected by barricades, fencing, railing with flags, lights, and/or signs placed at proper intervals and at prescribed hours in accordance with the most recent version of the Manual on Uniform Traffic Control Devices (MUTCD), published by the Federal Highway Administration, and the New York State Supplement. font size. If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. WORK INCLUDES: CURB/SIDEWALK REPAIR AS NEEDED; ROADWAY MILLING/REPAIR AND RESURFACING; REMOVAL OF CENTER MEDIAN; RESETTING UTILITY OPENING; REMOVAL/REINSTALLATION OF TRAFFIC SIGNALS INCLUDING CONDUIT; INSTALLATION OF PAVEMENT MARKINGS AND PARKING SIGNAGE. "Backfill" refers to the bottom layer of the restoration. DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. There is no fine associated with a Sidewalk Violation. This is discussed in greater detail under Section 4.3 Street Restoration Requirements, and in theSections 2-11(e)(15), 2-11(e)(16) and 2-11(f) of the Highway Rules. Policies; Accessibility; About CT; In order to maintain world-class streets, permits must be obtained for the work performed in the street. THE PERMITTEE MUST HAVE APPROVAL FROM NYCDOT STREET LIGHTING FOR INSTALLATION/REPLACEMENT OF POLES. Other conditions may apply, such as a variation in the distance and width of the job, which may increase the fee required. Staten Island, NY 10301 210 Joralemon Street, 8th Floor In some cases, approval from the LPC (if the vault is in an historic district) or the Metropolitan Transportation Authority (MTA) (if the vault is near a subway or tunnel entrance) is required. As of August 31, 2017, a new Holiday Embargo (HE) review process has replaced the previously used HE waiver request process used by NYCSTREETS. Plumbers*: Enter the plumber's license number and name on license (if applicable). NYC Parks & Recreation View the, Applicants must obtain all applicable original permits and/or approvals from any other governmental agencies prior to applying for a permit. 22 Reade Street, 6th Fl. Manhattan check-in window hours extended to 3:30pm for Bronx work only. Additional requirements are contained in Sections 2-02 and 2-11 of the Highway Rules and should be consulted before any work is performed on the street. 55 Water Street, New York, NY 10041 OCCUPY 12 FOOT WIDTH OF ROADWAY; FULL WIDTH OF ROADWAY RESTORED TO TRAFFIC WHEN SITE IS UNATTENDED. All Street Opening permit types usually allow for work within 300 linear feet by a width of 12 feet. Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. Upon completion of the inspection, HIQA makes a final determination as to whether the location is suitable for a canopy placement. Canopies must be well-maintained at all times. Office hours: 8:30 AM-4:30 PM, Brooklyn LMZ (Lower Manhattan Zone) hold This hold signifies that you are working on a street that falls within the Lower Manhattan Zone (south of and including Canal Street). EAU will process the request and fax or call the applicant with an Emergency Street Opening Permit Number, which authorizes the emergency street opening/excavation work. Entities that perform work in the streetsfrom utilities or contractors accessing subsurface infrastructure to property owners repairing sidewalksmust follow certain procedures when undertaking such work and must meet restoration requirements following its completion. All applicable fees will apply. Freeway, about 619-001: Temporary Positive Barrier (6 Sheets), about 619-002: Type III Construction Barricades (2 Sheets), about 619-004: Portable Temporary Wooden Sign Support, about 619-005: Details on Placement of Portable Temporary Rumble Strips, about 619-010: Work Zone Traffic Control General Notes, about 619-011: Work Zone Traffic Control General Tables & Legend, about 619-022: Shoulder Closure/Lane Encroachment, Official Electronic Standard Specifications and Standard Sheets website, 619-001: Temporary Positive Barrier (6 Sheets), 619-002: Type III Construction Barricades (2 Sheets), 619-004: Portable Temporary Wooden Sign Support, 619-005: Details on Placement of Portable Temporary Rumble Strips, 619-010: Work Zone Traffic Control General Notes, 619-011: Work Zone Traffic Control General Tables & Legend, 619-022: Shoulder Closure/Lane Encroachment. COORDINATE CONSTRUCTION ACTIVITY WITH THEATRE GROUPS PRIOR TO WORK. Brooklyn, NY 11201 Any emergency work on a street that involves a street opening/excavation requires a Street Opening Permit. At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see, Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. Further information on responding to Orders may be found in the Highway Rules, Section 2-02(e). SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The fee for reissuance may be found in Section 2-03 of the Highway Rules. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available in. Customer Service: (212) 566-0042, Queens (212) 839-8857 Applicants must submit a completed permit application. Full Sidewalk | NYC Street Design Manual Department of Transportation. TRAFFIC STANDARD GUIDE SHEETS DETAILS - ct Applicants may provide complete copies of insurance policies instead of certificates of insurance. A table showing the agencies that must be contacted prior to applying for certain NYC DOT permit types can be found in, If the applicant intends to work on a contract that has been awarded by a government agency or authority, the applicant must bring a copy of the contract, Order on Letter, Notice to Proceed or a Letter of Authorization. This requires a minimum distance on narrow sidewalks (10-12 feet Secondary Streets) of 5 ft., or a minimum distance on wide sidewalks (Larger than 12 feet Main Streets) of 8 ft. Interpreting Parking or Traffic Sign or Regulation Locate Parking Signs on Specific Streets Parking Sign Fact Sheet Parking in a School Zone Parking Rules School Bus Parking BACKFILL/COMPACT IN 12 INCH LIFTS. Manhattan / Central Permit Office The latest edition is available for purchase for $50 from the Office of the Agency Chief Contracting Officer, 55 Water Street, Ground Level, New York, NY, 10041. serviceInformation on long-term capital programs from potential street excavators helps NYC DOT to effectively coordinate planned street work. TWO SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. Prior to submitting a Street Opening Permit application, the Protected Streets Listing should be consulted in order to determine if the proposed work location is in protected status. Include the names of any expediter. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. For street operations, a crane permit is required for all cranes and derricks operating in the street with a maximum rated capacity greater than 20 tons and which are not related to building operations. Following are the steps for permit application, review and issuance at the borough Permit Offices: There are borough permit offices in Brooklyn, the Bronx, Queens and Staten Island. The central Permit Office entrance is via Vietnam Memorial Plaza between Water and South Streets. 30-30 Thomson Avenue, 4th Floor It could be because it is not supported, or that JavaScript is intentionally disabled. They shall not be in a stand alone subset. New York, NY 10007-1216 Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. Report a problem. YOU MUST SURVEY THE SITE. Permittees can use these maps to make informed decisions while planning new projects. ONE LANE MAY REMAIN CLOSED, FOR CONCRETE CURING ONLY, FOR A MAXIMUM OF 48 CONSECUTIVE HOURS MONDAY TO FRIDAY IF WEEKDAY WORK HOURS ARE GRANTED, OR FROM 12:01AM SATURDAY THROUGH 6AM MONDAY IF WEEKEND OR NIGHTLY (7 NIGHTS) WORK HOURS ARE GRANTED. Only a canopy installer or authorized agent that is registered with NYC DOT can apply for a permit to install the canopy. 24 West 61st St., 5th Fl. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR ORIGIN TO DESTINATION FOR DISTANCE OF TRENCH CURB TO CURB AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. View information on how to navigate and use NYCityMap. A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. These forms may also be found inAppendix B, Forms. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. MeetingsRegular coordination meetings allow decision makers to share information and to discuss project difficulties and constraints. ALL OCCUPANCY OF THE ROADWAY SHALL BE CONFINED TO THE PARKING LANE ONLY, WITH NO IMPACT ON THE BIKE LANE OR TRAVEL LANES AT ANY TIME. HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. Download a PDF of the Lighting chapter for offline access to the content in this section. Office hours: 8:30 AM-5:00 PM, Queens THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. DOT is also testing solar-powered lighting at select locations in flood-prone areas. NYC DOT's street reconstruction and resurfacing programs include nearly 6,000 miles of city streets. A permit is required for new sidewalk installation, repairs, and replacements. One call to New York 811 provides for where gas (yellow), electric (red) and phone (orange) are located. 144-06 94th Avenue, Main Floor A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. Resources | NYC Street Design Manual Fax: (718) 993-3077. In Chapters 3 and 4, the symbol is used to indicate particularly time-sensitive requirements of the processes described. NO WORK MAY EXTEND MORE THAN 8 FEET FROM CURB WITHOUT EXPLICIT AUTHORIZATION OF MTCCC. Payment by an applicant of outstanding fines, civil penalties or judgments imposed or entered against such applicant by a court or ECB; Payment by an applicant of outstanding fees or other charges lawfully assessed by NYC DOT against such applicant pursuant to the Highway Rules or other applicable law; and/or, Satisfactory compliance by an applicant with a CAR or order issued by the Commissioner. (212) 839-2387/88/89 Please visit the Manhattan Office, located at 55 Water Street. 130 Stuyvesant Place, 6th Fl. To request release of an STP hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. Questions regarding permit registration can be directed to the central Permit Office. COLORED ROADWAY AND OR SPECIAL MARKINGS ARE LOCATED ON THE ROADWAY OF YOUR PROPOSED WORK AREA. If all information is satisfactory, EAU will fax or call the applicant with an EAN, which must be available at the work site and presented to any governmental employee upon request. Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. FULL WIDTH OF ROADWAY NOT REQUIRED DURING CONCRETE CURING PERIOD. The Office of Permit Management (Permit Office) provides extensive customer support for all applicants, registers permittees, receives and reviews for accuracy and completeness permit application submitted in person,and also reviews appropriate fees for both online and in-person applications. CTDOT_Traffic_STD.zip 1400 Williamsbridge Road, 2nd Floor OCCUPY 15 FEET OF E/S CURB LANE. 8:30 AM to 4:30 PM, Staten Island IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. NYC Parks & Recreation (212) 839-2399 FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. 1 Centre Street, 9th Floor SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Cranes may require permits from DOB in addition to NYC DOT. DOTMap also features a protected streets layer, enabling utilities and other potential street excavators to view which streets are protected and for what period of time. Tel: (718) 482-4825. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPLUATED HEREIN. FULL TRAVEL LANE RESTORATION WOULD BE REQUIRED FOR 11' WIDTH OF TRAVEL LANE AND THE LENGTH OF THE WORK PLUS ANY LL14 CUTBACKS. Links were last checked January 2023. Customer Service: (718) 816-2300, The Bronx REQUIRES BUREAU OF BRIDGES APPROVAL PRIOR TO WORK. Form must be notarized. BLKRES-RESTORE AS PER SKETCH #4 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. NYC DOT also routinely meets with utility companies and others who perform street excavations to inform these organizations of upcoming events and major construction projects with which NYC DOT is involved. To this end, the Street Works Manual is a resource for all parties that perform work in New York City streets, from utilities and contractors installing, replacing and repairing underground infrastructure to developers replacing roadways and sidewalks adjacent to building sites and homeowners performing their own sidewalk repairs. The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. WORK FROM 7 PM FRIDAY THROUGH 6 AM MONDAY. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. Further information on responding to ECB violations may be found on the ECB website. In-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted to the central Permit Office in Manhattan. MUST CONTACT NYSDOT ENGINEER IN CHARGE NIGHTLY TO COORDINATE. To this end, NYC DOT has dedicated time and resources to enhance its own systems and coordination efforts. If all the documentation is accepted, pre-determined permit stipulations are added to the permit and the application is sent for processing. NYSDOT designers may find the USC files in ProjectWise at: Doing Business with NYSDOT - (business-center), Rock Slope Reinforcement & Catchment Systems, Survey Operations, ROW Markers, & Permanent Survey Markers, Delineators, Reference Markers and Snowplowing Markers. Most vault work also requires plan approval and a permit from DOB. The location to which the application should be submitted depends on the location and type of construction-related work to be performed: Central Permit Office in ManhattanIn-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted only to the central Permit Office in Manhattan. Apply for a parking permit. The notice provisions specified in Section 2-02(g) of the Highway Rules are the minimum required for street operations. Transverse SlopeSidewalks must be laid to pitch from the building line toward the curb. Office hours: 8:30 AM-4:30 PM. Office hours: 8:30 AM-4:30 PM, Staten Island The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. Attn: Forestry PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED. CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. Permit Bond. CONTAINMENT ONLY TO RESTRICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL. NYC Government Publication | NYC DOT STANDARD DETAILS OF CONSTRUCTION 59 Maiden Lane, 34th Floor ON STIP WAGE02), WORK NORTHBOUND 7AM-4PM M-F AND 9AM-6PM SAT/SUN. The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. Inevitably, street excavations to install or access this infrastructure disrupt the normal activity of New York's streets, causing frustration and confusion for local residents and businesses. NO WORK CAN OCCUR WITHIN 2 BLOCKS OF AN ACTIVELY OPERATING NYCDDC SITE. OCCUPY A MAXIMUM OF 12 FT OF ROADWAY FOR ASBESTOS REMOVAL ONLY BETWEEN THE HOURS OF 7PM - 6AM, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING CENTER MALL. APPROVED PLANS MUST BE ON SITE. Building Operations/Construction Activity Permits are designated as the "02" permit series, meaning all permits in this category begin with "02". ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. A list of the forms most commonly used during this process can be found inAppendix B, Forms. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. Street excavators, including utility companies and developers, can access New York City Department of Transportation (NYC DOT) data and attend NYC DOT coordination meetings to facilitate effective communication regarding planned street work. (NAME AT LEAST 2). Upon a satisfactory inspection, the hold(s) will be released. New York City Department of Transportation Parking Signs and Rules NYC311 - Government Of New York City For building operations, a crane permit is required for all cranes and derricks operating in the street on building construction or related activity under the jurisdiction of DOB, with the exception of truck cranes with telescopic, hydraulic or folding booms, over 50 feet and not more than 135 feet with a maximum rated capacity of 3 tons, for which a construction activity permit has been issued. Contact information pertaining to the release of holds by NYC DOT can be found in Appendix C, NYC DOT Contact Information. ON WEEKDAYS FROM 6AM TO 7PM MUST WORK BEHIND BARRIER WHILE MAINTAINING HALF SIDEWALK (MIN 5 FEET) FOR PEDESTRIANS AND NO USE OF ROADWAY. During the application process, the NYCSTREETS system will automatically identify cases which require additional HE review, and processes them accordingly. THE SIGN MUST BE PLACED AT A HEIGHT OF 7 TO 10 FEET AND STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF THE CLOSURE. Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York.

Heat Press Settings For Laminate Sheets, Who Died In Virginia Car Crash Yesterday, Articles N
This entry was posted in youngstown state football roster 1990. Bookmark the university of maryland hospital psychiatric unit.

nyc dot traffic standard drawings